CPC Customer Presentation Centre

The Customer Presentation Centre  featured installed Nortel kit.  Basically the “Run Nortel on Nortel” concept.

It was built where the old Cash Office and Employee Shop had been through the 70’s, using the split level to good effect.

Built around 1996, for the first months of operation the sound of the Top Gun movie could be heard during Customer visits. The demonstration was to have the movie running across the network, then disconnect the main fibre optic and see no break in the movie sound as the network automatically discovered the resilient route. Quite the favourite for Leslie Orr who ran the Customer centre.

IMG_20170227_0027The comfy chairs, for visitors, or Managers who were waiting nervously for presentations of results to the Cabinet.  Not so comfy chairs then … sometimes.

There were many visits to this centre, maybe you remember some specifically. Or times when you came through the Meeting room doors, saw some unexpected visitors and realised this was the last place you wanted to be.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s